24th – 26th October 2016 | DoubleTree by Hilton, Kuala Lumpur, Malaysia

Mads Bernitt


Interface Manager
Veja Mate Offshore Project GmbH


09:40 Veja Mate A 400MW North Sea Project: Interface Management within the offshore wind industry

  • Address the process of installation in offshore wind projects
  • Utilise Interface Management when constructing 100 structures in collaboration with contractors working offshore
  • Examine best practice for interfaces during the design and construction phase: 3D model use, mock-up trials and design workshops

11:00 Cross-industry panel discussion: What is the best approach to Interface Management?

  • Evaluating cross-sector approaches to implementing interface management
  • What can we learn from each other?
  • What are the common challenges and how best can they be overcome?
  • Is it possible to cooperate?


Check out the incredible speaker line-up to see who will be joining Mads.

Download The Latest Agenda